Soto Norte

A Sustainable, Community‑integrated Gold Project

Located in the historic California–Vetas mining district of Colombia's Santander Department, our Soto Norte operation is one of the most attractive gold opportunities in the Americas.

A 2025 prefeasibility study outlines a long‑life underground mine with robust economics, lower operating costs, and leading‑edge environmental and social safeguards, including a downsized 3,500 tpd plant that reserves over 20% of capacity for local community miners and a design that collects, treats, and safely returns all mine water to protect regional supplies.

Operational Focus

We are finalizing environmental studies and preparing to apply for an environmental license in H1 2026.

Where We Operate

Soto Norte Operations at a Glance

High-grade & Long-life Reserves & Resources

4.6 Moz P&P gold reserves at 7.0 g/t

7.0 Moz gold resources at 5.6 g/t

Life of Mine (LOM)

4.3 Moz

(production potential)

Years 2 to 10

263 koz

(production potential)

2026 Catalysts

Environmental license application scheduled to be submitted in Q2.

Site Facts

  • Location: Santander, Colombia (~350 km from Bogota).
  • Soto Norte is a high-grade, low cost, long-life underground project, designed to use proven and safe mining and processing methods.
  • PFS outlines a responsibly designed project that balances scale and strong economics with industry leading environmental and social considerations, featuring:
    • Acceptable size to secure support from host community and regulators.
    • Selective mining to optimize cash flow, not taking every ounce.
    • Environmentally sound operations including minimal water use and surface tailings storage.
    • A processing plant with 20% excess capacity to facilitate local, small scale miner formalization.

Prefeasibility Study Results

Operational Project Parameters

Mill Throughput

3,500tpd
Including 750 tpd for local community miners
(processing capacity)

Mine Life{{1}}

22 years
(mineral reserves)

Life of Mine

4.3 Moz
(gold production)

Annual Average

263 koz
Years 2 to 10
(gold production)

Annual Average

203 koz
Years 1 to 21 (gold production)

Key Financial Metrics{{1,2}}

$534/oz (LOM)

AISC

$410M (years 1 to 21)

Average Annual EBITDA

$625M

Initial Construction Capital

$2.7B

After-tax NPV5%

35.4%

After-tax IRR

  1. At an owner-mining rate of 2,750 tpd.
  2. Base case gold price of $2,600/oz

Our Approach to Responsible Development

We’re focused on generating substantial long‑term value for shareholders, communities, and government partners, while maintaining the highest standards of safety, water protection, and environmental management.

Community Processing Capacity

Our processing plant provides 20% excess capacity (750 tpd) to facilitate local, small scale miner formalization.

Minimal Water Use and Surface Tailings Storage

Our recycling system allows 96.5% water reuse. Almost half of the produced tailings to be stored underground.

Local Employment

During peak construction, we will create about 2,300 jobs, with long-term operations sustaining about 675 direct employees.

No Cyanide or Mercury

Our processing facility will not use cyanide or mercury.

Community Engagement Model

Our structured engagement model empowers communities to identify priorities and propose initiatives.

Environmentally Sound Operations

Our use of a rope conveyor reduces truck traffic, dust, and spillage.

Water Protection and Improvement

Our operation is designed to protect local watercourses.

Filtered Tailings Facility

We use best-practice designs according to globally recognized standards.

Contract Mining Partners

Our Partnership-driven Model

We integrate local small-scale miners into a formal, safe, and environmentally responsible framework through our Contract Mining Partners (CMPs). This allows us to support thousands of jobs while securing reliable mill feed. Our CMP model allows us to formalize artisanal mining, streamline permitting, and expand technical support.

Learn More About Our Contract Mining Partners

Reserves & Resources

Review our Mineral Reserves & Resources to better understand the scale behind our growth story — from high-grade producing mines to longer-term expansion projects across Colombia and Guyana.

Technical Reports

Our Technical Reports offer a deeper look at the geology, mine plans, and operating assumptions behind our growth story. They provide the details that help connect current production with our longer-term expansion potential.

Explore Our Other Operations

Segovia

Segovia is a world‑class, high‑grade underground gold mine in Colombia's historic Antioquia district, delivering strong production and room to grow through expanded processing and a successful contract mining partner model.

Marmato

We are transforming Marmato in Colombia from a small-scale, narrow vein operation into a high-capacity, mechanized mining complex by developing the Bulk Mining Zone and commissioning a new 5,000 tpd CIP plant.

Toroparu

Toroparu is a fully owned, large-scale gold development project in Guyana. With a robust resource base, attractive returns, and a prefeasibility study underway, Toroparu represents a significant opportunity to expand and diversify our production profile.